Bachy Soletanche steps up the action at Shepherds Bush

Leading geotechnical specialist, Bachy Soletanche Limited, has completed a £1m+ piling contract at Shepherds Bush (Central Line) Underground station - constructing two shafts for step-free access from the underground platforms. The shafts were constructed for the redevelopment using the hard/firm secant wall piling method during a five month programme working for Morgan Est who is the Principal Contractor.

Read More

Bachy Soletanche protects the Englishman’s castle

Leading geotechnical specialist, Bachy Soletanche Limited has just completed a project for Urban Regen to carry out the construction of a slurry cut-off wall as part of preparation works for a new residential development based in Tonge Moor, Bolton. The purpose of the slurry trench works were to permanently isolate the proposed built development within the site - preventing the ingress of any potential contaminants from the adjoining landfill via both permeable fill and natural ground.

Read More

Going piling by the dock at London’s Crossharbour site

Leading geotechnical specialist, Bachy Soletanche Limited has recently completed its first stage of piling works at Crossharbour, the high-profile development based in London City centre – constructing a secant wall around the perimeter of the substantial 6..8 acre site. The former London arena site is based in the heart of the Canary Wharf and Docklands business district and is one of the largest ongoing construction sites in London City centre.

Read More

Page 21 of 28 pages « First  <  19 20 21 22 23 >  Last »

News

News from Bachy Soletanche, click to view by category or by year.