Leading geotechnical specialist, Bachy Soletanche, is working on a £1.2M project to strengthen the surrounding ground of the Thirlmere Aqueduct at Nab Scar near Grasmere in the Lake District. Working from a great height, the Bachy Soletanche team is conducting a two phase permeation grouting, mini-piling and tension pile project alongside a fast track four week outage. The stabilisation project is due for completion within the next few weeks.
Read More
A tender winning design recently sent Bachy Soletanche to the large scale Rosyth Dock expansion project to install a piled retaining wall as part of the entrance extension. Awarded by main contractor Bam Nuttall, the geotechnical firm’s innovative solution used dowels to extend piles into the extremely strong rock as a more efficient and cost effective alternative to piling several metres deeper for the same effect.
Read More
With 20 locations, 28 structures and over two years on site, leading ground engineering experts, Bachy Soletanche Limited is nearing the end of one of its most varied and challenging projects to date; the East London Line Regeneration.
Read More