General News

Bachy Soletanche launches carbon calculator for plant & piling professionals

Specialist geotechnical contractors, Bachy Soletanche, has recently boosted its sustainability efforts with the introduction of its Carbon Calculator, which sees an environmental bill of quantities included with selected tender offers.

Read More

Bachy Soletanche powers up for wind turbine piling

Bachy Soletanche powers up for wind turbine piling

Specialist geotechnical contractors, Bachy Soletanche, is working on a 10 week £500,000 piling contract for Hanson Contracting to build the foundations for the Hellrigg Wind Farm in a remote location near the Solway Firth between Cumbria and Dumfries and Galloway.

Read More

Lee Tunnel: end of the D-Walls on the overflow shaft

Lee Tunnel: end of the D-Walls on the overflow shaft

Bachy Soletanche Ltd in a joint venture with Morgan Sindall and VINCI Construction Grande Projets (MVB) poured the last diaphragm wall panel of the first shaft on 10 February 2011. This diaphragm wall is 1500mm thick, 89m deep and reinforced top to bottom. Over 10,700m3 of concrete has been poured and as much excavated soil discharged directly into barges located on the Thames via a conveyor belt.

Read More

Page 3 of 10 pages  <  1 2 3 4 5 >  Last »

News

News from Bachy Soletanche, click to view by category or by year.