Lee Tunnel: end of the D-Walls on the overflow shaft

Lee Tunnel: end of the D-Walls on the overflow shaft

Bachy Soletanche Ltd in a joint venture with Morgan Sindall and VINCI Construction Grande Projets (MVB) poured the last diaphragm wall panel of the first shaft on 10 February 2011. This diaphragm wall is 1500mm thick, 89m deep and reinforced top to bottom. Over 10,700m3 of concrete has been poured and as much excavated soil discharged directly into barges located on the Thames via a conveyor belt.

Read More

Crossrail 510

Bachy Soletanche Ltd, in supporting the BBMV joint venture comprising Balfour Beatty Alpine Bemo Morgan Sindall and Vinci Construction Grande Projets, has recently been successful in securing the compensation grouting works associated with Crossrail Contract C510.

Read More

Bachy Soletanche in Epsom Station redevelopment

Bachy Soletanche in Epsom Station redevelopment

Specialist geotechnical contractors, Bachy Soletanche, has completed phase 2 of its CFA piling work at Epsom Station in Surrey as part of a £400,000 redevelopment project for main contractor Kier London and its client Solum Regeneration.